TEL ACT8-D -Track
ACT DB System, AC Power Box, T/C Unit 1+2, T/H Controller ESA 1+2, Chemical Cabinet 1, 2, 3
ACT DB System, AC Power Box, T/C Unit 1+2, T/H Controller ESA 1+2, Chemical Cabinet 1, 2, 3
AC Power Box, T/C Unit, T/H Controller 1+2, Chemical Cabinet, 4 Coater and 4 Developer
Last Time in production: 5/5/25
Automated Coating and Developing Cluster System
no missing parts
T/H controller 1 to 3 need service/repair
last time in production 10.1.2024
ACT8 DB System, 2 BCT, 2 COT, 3 DEV, 3 CHP, 1WEE, 10LHP, 2 ADH, 4 HHP, CWD,
Automated Coating and Developing Cluster System
no missing parts, no damages - well maintained
last time in Production 14.5.2024
ACT8 DB System, 2BCT, 2 COT, 4 DEV, 5PHP, 9 LHP, 4HHP, 2 ADH, 1WEE
two process blocks ACT 12 PIQ with 16 HCH Plates, 4 PCT´s 2 DEV Units, 1 WEE
last time in production: 07.08.2024
Log in with your username/email address